Monday 16 June 2014

Production Meeting Reflection 4

In this week, me and Jasmeet started on the Master Script together. There was a slight problem when getting the presenters script as we needed it sent to us but the person who had it, wasn't in and we couldn't get into contact with them as they weren't responding. Halfway into the lesson they sent us an email of the presenters script and me and Jasmeet went straight into the work. We were told that we only had until the start of Wednesday's lesson to get a majority of it done which meant that someone had do to it at home as we don't have a lesson on the Tuesday. Jasmeet was willing to do the Master Script because shes the director and she knows what she wants so she filled in some of the columns. In Wednesday's lesson, me and Jasmeet both worked on my column which was putting down the camera number of what we wanted to show on camera at that specific time. We finished that and the other peers with other jobs e.g. lighting, they filled in their own info into the columns. In the next two lessons, I wasn't in because I was on exam leave. 
The successful thing was getting most of the Master Script and completing my section of the column.
We don't need to change anything or develop anything at this moment of time, but if we find out what we do need to change/develop anything then we will.
Next week, I intend to working on the vision mixer and getting a feel of what it's like as the Live Day is on the Thursday. We have an all-day practice on the Tuesday where we will treat it likes it's the real thing to make sure we all feel confident on what we're doing.
Working with the director is an advantage because Jasmeet likes to get her work done which gives other peers the attitude of getting their work done which is good so we're on top of our work.

No comments:

Post a Comment